Browsing articles in "Projects with videos"
Feb 11, 2018

‘Stripes’ Hat

Lots of stripes, all ways – vertical and horizontal!  This is a fun hat for any level of knitter.  Choose your favorite color combination, and let the stripes begin!

Loom: ‘Rotating’ Double Knit Loom

Yarn:  Two different yarns used in sample, both #5 Chunky. Premier Serenity Chunky, Smoke Heather, 1 skein. Red Heart Soft Essentials, Greyhound, 1 skein.  Both yarns are 100% Acrylic and machine washable.

Stitches:  Stockinette and Figure 8

Notions:  Knit Hook, Crochet Hook, Darning Needle

Size:  Adult, 10” deep

Gauge:  5 rounds=1 inch

Abbreviations:  Rnd (s)=Round(s),  Aprox=approximately   Lt gray yarn=yarn 1  dark gray heather=yarn 2

Vertical stripes:  These rnds are worked with both yarns, always covering the same pegs with each yarn.  To cast on the loom, create a separate slip knot with each yarn.  Place first yarn slip knot on beginning peg. Wrap around loom with first color. Then with second round, attach the second color on first peg on inner loom (opposite the loop knot with first color). Wrap around loom, covering pegs skipped in first round.

Each round will end with one yarn coming from the outer loom, and one yarn coming from the inner loom. Repeat process covering all pegs with 2nd loop (see photo). Then hook over the bottom loop over top loop.

 

 

 

 

 

 

 

 

 

 

INSTRUCTIONS

Cast On 52 stitches in Stockinette with both yarns to create the vertical stripes.  Lay anchor yarn.

Rnds 1- 8:  Work in Stockinette with both yarns in vertical stripes.

Rnds 9-11:  Lay yarn 2 aside and work with yarn 1 in Stockinette. (3 rnds)

Rnds 12-14:  Lay yarn 1 aside and work with yarn 2 in Stockinette.  (3 rnds)

Double Vertical Stripes:  Rnds 15-19 (5 rnds) will be in Figure 8 stitch.  Lay yarn 2 aside and work full rnd with yarn 1, on every other 2 stitches.  Wrap front to back of same stitch working 2 stitches, skip 2 pegs, and work next 2 pegs. Wrap each stitch in direction like the number 8. Keep this process going until you have a full rnd and are back to beginning.  Lay yarn 1 aside and work the round covering the skipped stitches, front to back, in Figure 8 with yarn 2.

 

 

 

 

 

 

Rnds 20-22:  Cut yarn 1 and tie off with yarn 2.  Work 3 rnds in Stockinette with yarn 2.

Rnds 23-25:  Place a new loop knot of yarn 1 on beginning peg and work in Stockinette for 3 rnds.

Next 12 rnds:  With both yarns attached and on beginning pegs, repeat the vertical stripes as in the first 8 rnds.

Rnd 38:  Lay yarn 2 aside and work one rnd with yarn 1 in Stockinette.  Cut yarn 1 with 2-3” tail.

Rnd 39-44:  Knot yarn 2 with yarn 1 tail.  Work in stockinette with yarn 2 for 6 rnds.

Hat should measure 9.5”-10” high and you are ready to bind off, and close up the hat crown.

Bind Off:  Cut yarn 2 with aprox 20” yarn tail.  Gently pull stitches snug on pegs.  Move the loops from inner loom to same stitch on outer loom, so that the inner loom is empty.  Hook over each stitch, so that you have just one loop on each peg on outer loom.

Place the yarn tail on large darning needle.  You will be transferring the loops onto the yarn for the gather bind off.

Moving from R to L, insert the needle thru the loop from underneath and allow it to slide onto the yarn.  Remove it from the loom.  Pick up next loop and allow it to slide onto the yarn and remove it from the loom.  Continue around the loom lifting each loop and transferring it to the yarn, until all loops are on the yarn.  The hat is now free of the loom and it can be lifted up and off the loom.

Finishing:  Leave the yarn on the darning needle.  Gently, gather the top edge of the hat by pulling the yarn and drawing the top of hat together.  Once the opening is small, you can take the yarn to inside of hat and use the darning needle to sew the hat closed.  Knot securely.  Leave the yarn tail attached to use to sew on the pompom.

Work a single crochet bind off of cast on stitches using the crochet hook.  Be sure to work towards the yarn tail, so that you end the bind off at the yarn tail. Once you have worked all the stitches on the anchor yarn, there will be only the one loop on the crochet hook. Pull the yarn tail thru the last loop to knot.  Gently remove the anchor yarn.

Weave in all yarn tails that may remain, or pull to inside of hat and trim.  This is best done with the crochet hook.

Pompom:  You will make a crochet chain of each color yarn that is aprox 40” long with the crochet hook. Start with a loop knot, pulled so that it is about the size of a pencil. Insert the crochet hook into the loop, grab the yarn and pull it thru the loop so that you have a new loop.  Grab the yarn again, and keep going in this manner to create the chain.  Once you have aprox 40” of crochet chain, knot the last loop.  Trim ends to about ½”.  Repeat the process with the other yarn.

 

Once you have both yarn chains complete, roll them together as if making a Christmas bow.  Tie in center and knot.  If you would rather, you can make a traditional pompom or tassels.  Just have fun with the adornment!

Sew securely to top of hat using the yarn tail and darning needle.  Cut end of yarn after sewing is complete and weave in yarn tail into the knit, or pull to inside of hat.

 

8 Comments

  • I love everything about this hat, the color, stripes, the top…so good! Great post!

  • Is there a stitchology for February?

  • Is there a stitcholgy for February?

  • Stitchology has been canceled. Our lovely designer has other wonderful opportunities that she is pursuing.

  • Stitchology has been canceled. Our lovely designer has other wonderful opportunities that she is pursuing.

  • Sorry to hear stitcholgy has been discontinued

  • Can this hat be made with #4 weight yarn?

  • Hi Jean,
    The hat could be done in #4 yarn but the result would be thinner and the change of color may show a bit between the stripes. Also, the hat will be a little smaller but will fit head circumference of about 20-21″. The sample hat fits looser or up to head circumference of 23″.

Leave a comment

     share this post: Share '‘Stripes’ Hat' on Delicious Share '‘Stripes’ Hat' on Digg Share '‘Stripes’ Hat' on Facebook Share '‘Stripes’ Hat' on Google+ Share '‘Stripes’ Hat' on LinkedIn Share '‘Stripes’ Hat' on Pinterest Share '‘Stripes’ Hat' on reddit Share '‘Stripes’ Hat' on StumbleUpon Share '‘Stripes’ Hat' on Twitter Share '‘Stripes’ Hat' on Add to Bookmarks Share '‘Stripes’ Hat' on Email Share '‘Stripes’ Hat' on Print Friendly
Mar 7, 2017

Lady of Rohan Wrap

Wrap yourself in warmth with this lovely shawl. A simple heart design wraps around the hemline of this garment, and garter stitch bands frame the front. 

LOOM: 28” Loom (168 pegs)

YARN: Approx 1050 yards of worsted weight merino wool. Malabrigo Rios, merino wool, in Ravelry was used in sample.

NOTIONS: knitting tool, tapestry needle

OTHER: 1 Button, size 1”

GAUGE: 22 sts x 27 rows=4 inches in stockinette

SIZE: Approx 23” long x 43” wide

ABBREVIATIONS

k=knit stitch (the u-stitch was used in sample)

p=purl stitch

st(s)=stitches

k2tog=knit two stitches together, right slanting decrease

yo=yarn over (place working yarn in front of empty peg)

ssk=knit two stitches together, left slanting decrease

cdd= centered double decrease on a loom. Over 3 pegs. Move loop from peg 1 to peg 2. Take yarn behind peg 1 and 2, knit peg 3. Move loop from peg 3 to peg 2. Lift bottommost 2 loops off peg 2.

Stitch Patterns

Heart stitch (chart at end of pattern)

Note: chart has the key for CDD as sl 1, k2tog psso

Row 1: k4, ssk, yo, k4; rep from * to last st, k1

Row 2: k to end of row (all even rows)

Row 3: *k4, yo, CDD, yo, k3; rep from * to last st, k1.

Row 5: *yo, k2tog, k2, ssk, yo, k2; rep from * to last st, k1.

Row 7: *yo, k2tog, k3, ssk, yo, k1; rep from * to last st, k1

Row 9: *k1, yo, k2tog, k5, ssk, yo; rep from * to last st, k1.

Row 11: *k1, yo, ssk, k1, ssk, yo, k2, k2tog, yo; rep from * to last st, k1.

Row 13: *k2, yo, CDD, yo, k1, yo, CDD, yo, k1; rep from * to last st, k1.

Row 14: k to end of row.

Garter stitch

Row 1: k to end of row.

Row 2: p to end of row.

Row 1 and Row 2: 1 Garter stitch ridge.

INSTRUCTIONS

Cast on 167 pegs, prepare to work a flat panel.

Row 1, 3, 5, 7, 9: k to end of row.

Row 2, 4, 6, 8: p to end of row.

Row 10: p3, k161, p3 (all even rows).

Row 11: k3, *k4, ssk, yo, k4; rep from * to last 4 sts, k4.

Row 13: k3, *k4, yo, CDD, yo, k3; rep from * to last 4 sts, k4.

Row 15: k3, *yo, k2tog, k2, ssk, yo, k2; rep from * to last 4 sts, k4.

Row 17: k2, *yo, k2tog, k3, ssk, yo, k1; rep from * to last 4 sts; k4.

Row 19: k3, *k1, yo, k2tog, k5, ssk, yo; rep from * to last 4 sts, k4.

Row 21: k3, *k1, yo, ssk, k1, ssk, yo, k2, k2tog, yo; rep from * to last 4 sts, k4.

Row 23: k3, *k2, yo, CDD, yo, k1, yo, CDD, yo, k1; rep from * to last 4 sts, k4.

Row 24: p3, k161, p3.

Row 25: k to end.

^Rep Row 24 and Row 25: 43 more times

Next row: k to end.

Next row: p to end.

**Next row: p3, k161, p3.

Next row: k to end.**

Rep from ** to ** 4 more times.

Next row: k to end.

Next row: p to end.

Rep from ** to **: 4 times.

Next row: k to end.

Next row: p to end.

Rep from ** to **: 3 times.

Next row: k to end.

Next row: p to end.

Rep from ** to **: 2 times.

Next row: k to end.

Next row: p to end.

Rep from ** to **: 1 time.

Next row: k to end.

Next row: p to end.

Transfer all the stitches to a piece of scrap yarn.  You will be using 86 pegs from this point forward.

Place the stitches back on the knitting loom as follows: the first three stitches, a stitch per peg. The next 160 stitches, 2 stitches peg peg (80 stitches). The last 4 stitches, place 2 stitches on the next peg, and a stitch per peg on the following two pegs. Your knitting loom should have single stitches on pegs 1-3, and pegs 85 and 86, all the other pegs should have 2 stitches per peg.

Next row: k to end. Treat the pegs with two loops as one loop.

Next row: p to end.

***Next row: k to end.

Next row: p to end. ***

Rep from *** to ***: 3 more times.

Bind off with basic bind off method.

Garter stitch bands
Cast on 20 sts, prepare to work a flat panel.

Work 78 garter stitch ridges.

Next row: *k2tog; rep from * to end of row.

Next row: p to end.

Next row: k to end.

Next row: p to end.

Next row: (button hole opening row) k3, k2tog, yo, k to end.

Next row: p to end.

Next row: k to end.

Weave all ends in. Steam block to open up the lace stitches in the heart pattern.

Next row: p to end.

Next row: k to end.

Next row: p to end.

Bind off with basic bind off method.

Make another Garter Stitch Band as instructed above, except, instead of working the button hole opening row as instructed, simply “knit to the end of the row).

Assembly

Position the narrower edge of the Garter stitch bands around the bind off edge of the shawl. Using the mattress stitch, seam the Garter Stitch bands to each side of the shawl.

Secure button to the Garter Stitch Band that does not have a button hole opening (be sure to line up the button hole opening to the button).

Tips: if you want to make the shawl longer: simply follow Rows 1-23 as stated. Work more rows of Row 24 and Row 25, where this symbol ^ is located in the pattern.

If making it longer, the Garter Stitch Bands must be longer too. Count the Garter stitch ridges on the shawl (the edge stitches created a garter stitch edge), and match the number of garter stitch ridges on the shawl onto the Garter Stitch Band.

 

Have questions or comments, please feel free to contact Isela Phelps by leaving a comment below. 

 

 

 

24 Comments

  • I don’t understand what are garter stitch ridges
    Where the pattern says work78 garter stitch ridges and th directions on how to make it longer
    Can you clarify this for me in some way?

  • Also there is a *K2tog*;rep from*
    Should there be a yo there?

  • Ginny, what number is this row?

  • Ginny,
    At the beginning of the pattern, it has a description of how to create a garter stitch ridge:
    Row 1: k to end of row.
    Row 2: p to end of row.
    These two rows create 1 garter stitch ridge.

    The Bands at the front of the Wrap are created in Garter Stitch. What you are doing is basically the following:
    Row 1 and all odd rows until you reach row 155: k to end of row.
    Row 2 and all even rows until you reach row 156: p to end of row.
    The above instructions should give you 78 garter stitch ridges.

    Hope the above helps.

  • The row is after it say to work 78 garter stitch rows
    Also question why does this have to be done with garter stitch bands?

  • No, that row does not have YO. You are decreasing from 20 sts to 10 sts.

    Why the garter stitch bands? That is the way I designed it. I wanted the front to have these bands. Also, the width of the Wrap is too small without them.

  • Thank you so much i am new to loom knitting
    Now I feel ready to start
    The shawl is gorgeous
    I just hope I can make it
    Thanks for all the help

  • Sorry me again
    I need to understand the CDD-centered double decrease

    The explanation indicates
    Over 3 pegs
    Move loop from peg 1 to peg 2
    Take yarn behind peg 1 and 2
    Knit peg 3
    Move loop from peg 3 to peg 2
    Lift bottommost 2 loops off peg 2

    The pattern has
    Yo,CDD,yo
    Question-When you lift buttommost 2 loops off peg (leaving 1 stitch still on peg 2 -the stitch brought over from peg 3 correct?)
    Then do you go ack to peg 1 and put yarn over then knit peg 2 then yarn over peg 3 then continue with rest of pattern

    Is there avideo on this or can there be one?

  • How do you do a CDD?

  • Ginny, the description for a CDD is above, by the abbreviations.

  • I think I have a video of the CDD but not with the YO next to it.

    This is the way I would do it:
    3 2 1

    Ewrap the peg to the right of peg 1.
    Move loop from peg 1 to peg 2. Take yarn behind peg 2, knit peg 3.
    Move loop from peg 3 over to peg 2. Lift bottommost loops off peg 2.
    Move the ewrap you placed on the peg to the right of peg 1 to the empty peg 1. Working yarn is at peg 2. Ewrap peg 3.

    You should have an ewrap on peg 1, one loop on peg 2, ewrap on peg 3.

    Hope the above helps.

  • Lift buttommost loom off peg 2
    I need clarification
    Does that mean knit them over peg leaving 1 loop on peg?
    Or
    Does it mean take top loop off take 2 loops off and return top loop on to peg?
    Or
    Does it mean something else?
    Thank you once again for your help

  • You lift them off, also known as knitting over, leaving only 1 loop on the peg. Simply go to the peg, lift the bottommost two loops up and off the peg. If you are on Facebook, we have a FB group where we are discussing this wrap and we have file on the stitch breakdown. https://www.facebook.com/groups/1278218605557139/

  • Beautiful, beautiful pattern and thanks for sharing. love love

  • What method of cast on do you use.

  • Hello,
    Could you tell me what the best way to make this wider would be? My mother in law is a much bigger woman than the girl modeling this cape, but she fell in love with it.
    Any help is appreciated

  • This might sound silly-but where do you start the heart pattern?

  • The heart stitch pattern starts on row 11 of the pattern.

  • Mary, I used the ewrap cast on. I use the tightening technique to tighten the cast on when I have completed the project.

  • Thank you!

  • Hi Deb,

    The easiest way to widen it would be to create two pieces of the main panel, the area that says Cast on 167 sts, but instead of casting on 167 sts, cast on 161 sts, omitting the first 3 sts and the last 3 sts that are done in garter stitch. Create two of those panels, seam them together. Create the garter stitch bands as instructed. This will create an item that is twice as wide.

  • Thank you!

  • Thank you so much for the video Isela
    It makes things clearer for a newbie
    Much thanks

  • I have braindead, Could you please explain this.

    Row 11: k3, *k4, ssk, yo, k4; rep from * to last 4 sts, k4.

    Just the rep from *to last 4 sts, k4

    I have skip around and just picked out one that is used a lot.

    Thanks! appreciate it.

Leave a comment

     share this post: Share 'Lady of Rohan Wrap' on Delicious Share 'Lady of Rohan Wrap' on Digg Share 'Lady of Rohan Wrap' on Facebook Share 'Lady of Rohan Wrap' on Google+ Share 'Lady of Rohan Wrap' on LinkedIn Share 'Lady of Rohan Wrap' on Pinterest Share 'Lady of Rohan Wrap' on reddit Share 'Lady of Rohan Wrap' on StumbleUpon Share 'Lady of Rohan Wrap' on Twitter Share 'Lady of Rohan Wrap' on Add to Bookmarks Share 'Lady of Rohan Wrap' on Email Share 'Lady of Rohan Wrap' on Print Friendly
Jul 24, 2015

Zippy Shawl & Shawlette

LH9A5627Open your wings and fly! Beautiful open stitches and winged tipped edges adorn the tips of this shawlette worked with a simple lace. Worked in garter stitch and short rows to provide width to the wingspan.

Knitting loom: Zippy loom (6 Zippy looms for the Zippy Shawlette, (7 Zippy looms for the Zippy Shawl).

Yarn: Approximately 120 yards of super bulky yarn for Zippy Shawlette (240 yards of super bulky yarn for the Zippy Shawl). Samples used Red Heart Boutique Twilight (2 skeins in Turquoise (4 skeins in Mercury) 59 yds/54m.

Notions: knitting tool, big eye tapestry needle.

Size: Zippy Shawlette: 40” wingspan by 16” to the tip.

Zippy Shawl: 70” wingspan by 28” to the tip.

Gauge: Zippy Shawlette: 5 sts x 8 rows= 4 inches (in garter stitch with the regular knit stitch).

Zippy Shawl: 4 sts x 5 rows= 4 inches (in garter stitch with ewrap knit stitch)

Pattern notes:

Connect the 6 (7 Zippy looms together) 24 (28 pegs).

Abbreviations

BBO: Basic bind off

CO: Cast on

EWK: Ewrap knit

k: knit stitch

p: purl stitch

sts:stitches

YO: yarn over (ewrap peg)

 

Zippy ShawletteLH9A5676

Time: Approximately 2.5-3  hours; each wedge takes approximately 10-15 minutes. 

INSTRUCTIONS

Ewrap cast on 18 sts (from peg 18 to peg 1-left to right).

Row 1: p to end of row (from peg 1 to peg 18).

Row 2: k 4 (peg 18, 17, 16, 15), YO 1 (ewrap peg 15), k 12 (from peg 14 to peg 3).

**Move the stitches as follows. Go to the peg with the YO (ewrap).

  1. With the right hand, remove the YO (ewrap) from the peg and hold it.
  2. With left hand, remove the loop that is on the peg (same peg that had the YO).
  3. Place the loop from the right hand on the empty peg.
  4. Transfer loop from the left hand to the right.LH9A5679
  5. Lift the loop from the next peg (to the left) and hold it with the left hand.
  6. Repeat steps 3 to 5: 3x.
  7. Place the last loop on next empty peg.**

In other words: You have 4 pegs on the left, (pegs 18, 17, 16, and 15) peg 15 has the YO (an extra ewrap, correct?

Place the YO (the ewrap) on a stitch holder and leave it there.

Move the loop on peg 18 over to its neighbor empty peg to the left, peg 19. You have just moved one of the stitches over one spot.

Move loop from peg 17 to the peg vacated previously (peg 18).

Repeat the same process with loop on peg 16, (moving it over to peg 17).

Repeat the same process with loop on peg 15( move it to peg 16) Peg 15 is empty.

Place the ewrap that is in the stitch holder on peg 15.

Row 3: p to end of row (from peg 3 to peg 19).

Row 4: k 4 (pegs 19, 18, 17, 16) YO1 (ewrap peg 16), k 11 (from peg 15 to peg 5).

Repeat from ** to **.

Row 5: p to the end of row (from peg 5 to peg 20).

Row 6: k 4 (pegs 20, 19, 18, 17) YO1 (ewrap peg 17), k 10 (from peg 16 to peg 7).

Repeat from ** to **.

Row 7: p to the end of row (from peg 7 to peg 21).

Row 8: k 4 (peg 21, 20, 19, 18) YO1 (ewrap peg 18), k 9 (from pegs 17 to peg 9).

Repeat from ** to **

Row 9: p to the end of row (from peg 9 to peg 22).

Row 10: Basic bind off 4 (pegs 22, 21, 20, 19). 18 sts rem. K 18 (from peg 18 to peg 1).

Repeat Row 1-Row 10: 9 more times.

Repeat Rows 1-Row 9.

Bind off with basic bind off method.

Tighten the cast on row using the tightening tip.

Block to emphasize the points of the shawl.

 

Zippy Shawl

LH9A5635Time: Approximately 4 hours. Each wedge takes approximately 20-25 minutes. 

The Zippy Shawl is worked similar to the Zippy Shawlette, except worked with the ewrap stitch to provide more length and width to the shawl as well as more open lace like stitches.

INSTRUCTIONS

Ewrap cast on 24 sts (from peg 24 to peg 1).

Row 1: p to end of row (from peg 1 to peg 24).

Row 2: EWK 4 (peg 24, 23, 22, 21), YO 1 (ewrap peg 21), EWK 18 (from peg 20 to peg 3).

**Move the stitches as follows. Go to the peg with the YO (ewrap).

  1. With the right hand, remove the YO (ewrap) from the peg and hold it.
  2. With left hand, remove the loop that is on the peg (same peg that had the YO).
  3. Place the loop from the right hand on the empty peg.
  4. Transfer loop from the left hand to the right.
  5. Lift the loop from the next peg (to the left) and hold it with the left hand.
  6. Repeat steps 3 to 5: 3x.
  7. Place the last loop on next empty peg.**

Row 3: p to end of row (from peg 3 to peg 25).

Row 4: EWK 4 (pegs 25, 24, 23, 22) YO 1 (ewrap peg 22), EWK 17 (from peg 21 to peg 5).

Repeat from ** to **.

Row 5: p to the end of row (from peg 5 to peg 26).

Row 6: EWK 4 (pegs 26, 25, 24, 23) YO 1 (ewrap peg 23), EWK 16 (from peg 22 to peg 7).

Repeat from ** to **.

Row 7: p to the end of row (from peg 7 to peg 27).

Row 8: EWK 4 (peg 27, 26, 25, 24) YO 1 (ewrap peg 24), EWK 15 (from pegs 23 to peg 9).

Repeat from ** to **

Row 9: p to the end of row (from peg 9 to peg 28).

Row 10: Basic bind off 4 (pegs 28, 27, 26, 25). 24 sts rem. EWK 24 (from peg 24 to peg 1).

Repeat Row 1-Row 10: 9 more times.

Repeat Rows 1-Row 9.

Bind off with basic bind off method.

Tighten the cast on row using the tightening tip.

Block to emphasize the points of the shawl.

 

4 Comments

  • Which way do you cast on? Right to Left (Clockwise), or Left to Righ(Counter Clockwise)?

  • Is there any way you could do a video on the following section of the pattern, I don’ understand it, thanks so much,

    *Move the stitches as follows. Go to the peg with the YO (ewrap).

    With the right hand, remove the YO (ewrap) from the peg and hold it.
    With left hand, remove the loop that is on the peg (same peg that had the YO).
    Place the loop from the right hand on the empty peg.
    Transfer loop from the left hand to the right.
    Lift the loop from the next peg (to the left) and hold it with the left hand.
    Repeat steps 3 to 5: 3x.
    Place the last loop on next empty peg.**

  • I’ll try to explain it in another way.

    You will need a stitch holder (a safety pin works) for this method. Let’s say you are doing the shawlette.

    Assume you are on the first section. You have 4 pegs on the left, (pegs 18, 17, 16, and 15) peg 15 has the YO (an extra ewrap, correct?

    Place the YO (the ewrap) on a stitch holder and leave it there.

    Move the loop on peg 18 over to its neighbor empty peg to the left, peg 19. You have just moved one of the stitches over one spot.

    Move loop from peg 17 to the peg vacated previously (peg 18).

    Repeat the same process with loop on peg 16, (moving it over to peg 17).

    Repeat the same process with loop on peg 15( move it to peg 16) Peg 15 is empty.

    Place the ewrap that is in the stitch holder on peg 15.

  • Hi Raelyn,
    Cast on from left to right so that the first row is from Right to Left.

Leave a comment

     share this post: Share 'Zippy Shawl & Shawlette' on Delicious Share 'Zippy Shawl & Shawlette' on Digg Share 'Zippy Shawl & Shawlette' on Facebook Share 'Zippy Shawl & Shawlette' on Google+ Share 'Zippy Shawl & Shawlette' on LinkedIn Share 'Zippy Shawl & Shawlette' on Pinterest Share 'Zippy Shawl & Shawlette' on reddit Share 'Zippy Shawl & Shawlette' on StumbleUpon Share 'Zippy Shawl & Shawlette' on Twitter Share 'Zippy Shawl & Shawlette' on Add to Bookmarks Share 'Zippy Shawl & Shawlette' on Email Share 'Zippy Shawl & Shawlette' on Print Friendly

Our Buttons

Categories

Meet Zippy!

LKC Magazine

Loom Knitting Magazine